projects

Wades Canyon Spring Development

Circleville Town had difficulties with a spring used to produce culinary water for the town water system. FCE evaluated the status of the spring and determined the best alternative to rehabilitate the spring and increase flow production. A feasibility report was written outlining the preferred alternative along with the estimated construction costs. That report was used to obtain funding from DDW for the construction portion of the project. Design drawings and specifications were prepared and submitted to the necessary State Agencies. FCE also assisted in construction review of the springs redevelopment and transmission line and prepared the operation and maintenance manual for the spring redevelopment.

In addition, FCE assisted Circleville with updating their water rights for two spring water sources.

We Know Water

We provide top-tier engineering
services to those who develop,
manage, and conserve this
precious resource.


©2013 Franson Civil Engineers.
All rights reserved.

Contact

1276 S. 820 E. 
Suite 100
American Fork, UT
84003

 

Toll Free: 888.756.3726
Office: 801.756.0309

 facebooktwitteryoutube