Helper Springs Rehabilitation

FCE assisted Helper City with the investigation, planning, design, permitting, and construction review activities as they relate to the rehabilitation of the Fish Creek Springs and Spring Canyon Springs. Work included: investigating the Fish Creek site to determine the method of spring collection; coordination with property owners to obtain the necessary easements and permits; acquisition of funding through the CIB; design of plans, specifications, and bid documents for construction of the springs' rehabilitation in accordance with DDW requirements; and performing construction review services to ensure quality construction and installation. Rehabilitation of the Spring Canyon Springs was completed in the summer of 2012.

The Fish Creek Springs required additional environmental work by two regulatory agencies. The U.S. Army Corp of Engineers (USACE) required a wetland delineation survey and subsequent permits and the Utah School and Institutional Trust Lands Administration (SITLA) required a cultural resources survey be completed on its land where an easement was needed. Rehabilitation of the Fish Creek Springs was completed in October 2014.

 

We Know Water

We provide top-tier engineering
services to those who develop,
manage, and conserve this
precious resource.


©2013 Franson Civil Engineers.
All rights reserved.

Contact

1276 S. 820 E. 
Suite 100
American Fork, UT
84003

 

Toll Free: 888.756.3726
Office: 801.756.0309

 facebooktwitteryoutube