Gunnison City Secondary System Improvements

In 2002, Gunnison City was looking to improve its existing secondary water system. The purpose of the project was to increase pressures in areas that had historically experienced pressure related problems. FCE assisted the City in obtaining a grant of $650,000 from Section 206 of the Central Utah Project Completion Act. An additional $477,000 came from local coffers and a loan from the Board of Water Resources. The project consisted of locating and designing a 17 acre-foot regulating pond in a strategic location to take advantage of the canal water source and to provide sufficient pressure to alleviate pressure problems.

Approximately five miles of main distribution pipeline (18-inches and 21-inches) from the canal to the pond and from the pond to the town system along with a parallel 18-inch PVC pipe for the field distribution system was designed. Also, the town added various 6-inch to 10-inch pipelines throughout the town system to loop and expand the system. Again, FCE assisted the city through the funding, planning, design, and construction phases of the project. Construction of the project was completed in 2005.

Award: ACEC-Utah Engineering Excellence Merit Award, 2004

 

 

We Know Water

We provide top-tier engineering
services to those who develop,
manage, and conserve this
precious resource.


©2013 Franson Civil Engineers.
All rights reserved.

Contact

1276 S. 820 E. 
Suite 100
American Fork, UT
84003

 

Toll Free: 888.756.3726
Office: 801.756.0309

 facebooktwitteryoutube