projects

Antimony Springs Rehabilitation

FCE assisted Antimony Town in overcoming the difficulties that they faced in regards to their culinary water system. FCE worked with the town to determine current and future culinary water system needs by addressing each and every one of the deficiencies identified within the system. Throughout this process, the town was able to upgrade most of the components of their culinary water infrastructure as well as realize a significant reduction in water usage.

Pole Canyon Spring Re-Development

One way to increase the amount of water available to a water system is to increase the source capacity. During the installation of the 6" transmission pipeline from Pole Canyon Spring, the spring was re-developed using current technology. The work done on the spring was able to produce an additional 10% of source capacity, or an additional 15 gpm, for the Town of Antimony.

Little Forest Springs Re-Development

As part of the East Bench system upgrades, the Little Forest Springs were also rehabilitated. These springs had lost some of its capacity over the years due to vegetation that had pushed roots down into the collection system. Both sides of the spring were re-developed using current technology. Little Forest Springs saw an increased production of 25% or approximately 9 gpm.

We Know Water

We provide top-tier engineering
services to those who develop,
manage, and conserve this
precious resource.


©2013 Franson Civil Engineers.
All rights reserved.

Contact

1276 S. 820 E. 
Suite 100
American Fork, UT
84003

 

Toll Free: 888.756.3726
Office: 801.756.0309

 facebooktwitteryoutube